1-3 St James, 113-113A Pyle St, 24-24A St James Sq, Newport, IOW, PO30 1BS

Pedestrians in Newport Town Centre at 1-3 St James, 113-113 a Pyle St, 24-24A St James Square, Newport, Isle of Wight, PO30 1BS had a narrow escape on Saturday morning when a section of brickwork suddenly plunged onto the pavement. The masonry collapsed from the building above the former Favian barbershop on Pyle Street, prompting an immediate police response and a safety cordon at the junction of St James’ Street.

Cowes resident Emma Davis, 44, was walking just outside TK Maxx with her six-year-old son, Max, when the wall gave way. She described the collapse as sounding like a loud explosion, followed by a thick cloud of dust that rushed down the street. Davis witnessed another woman leaping out of the path of the falling rubble, noting that the pedestrian was incredibly lucky to walk away unharmed.

Hampshire and Isle of Wight Constabulary were called to the scene at around 10:30 a.m. to assist with road closures and secure the area. While the initial debris has been cleared from the street, officers have remained on site to manage the public cordon and ensure the area is safe.

https://www.countypress.co.uk/news/24745988.isle-wight-wall-collapse-newport-almost-hit-pedestrian/

1-3 St James, 113-113A Pyle St, 24-24A St James Sq, Newport, Isle of Wight, PO30 1BS

INSPECTION DATE

Thursday 23rd April 2026 and Tuesday 5th May 2026

WEATHER

On Thursday 23rd

, the weather was fine and dry, following similar weather conditions and limited

recent rainfall during the past 7 days. On the 5th of May, the weather was overcast and dry.

INSPECTION

Tombleson Associates are commissioned to undertake a Brief Condition Inspection (BCI) of the

property. It is important to bear in mind this not considered to be a full Building Survey. As a

result, there are likely to be areas of further investigation considered necessary, prior to

exchange of Contracts. The primary objective of this report is to provide you with initial guidance

from which to base your pre-Contract enquiries.

Only information contained within this report has been considered during our inspection.

During our inspection, all parts of the property were furnished and occupied.

2PREAMBLE

The subject property forms a corner terrace comprising three separate commercial buildings at

ground level with one additional small commercial property subdivided from 24 St James Street.

Shared access from Pyle Street leads to the three separate flats located at first, second and third

floor level.

The energy Performance Rating Certificates for each induvial part of the property are as follows:

24 St James Street – No EPC lodged on national database

24a St James Square – C65

113 Pyle Street – C61

113a Pyle Street – D83

Flat 1 – E41 (expired)

Flat 2 – D65 (expired)

Flat 3 – No EPC lodged on national database

As you are aware, parts of the property are designated Grade II Listed. It is essential to

understand your future obligations relating to the liability of owners for a Listed property.

Further information on this aspect can be found by visiting the Heritage England website

www.historicengland.org.uk along with the Conservation Department website of the Local

Authority; www.iwight.com/conservation.

In 2024, a section of the elevation facing Pyle Street collapsed at first floor level. Subsequent

repairs were overseen by Elmstone Engineering. Following discussion with their Director, we

understand that the necessary works have been undertaken to a robust and satisfactory

condition. Therefore, it is essential to obtain all relevant documentation including a Certificate

of Structural Adequacy to verify that works have been undertaken to a satisfactory and

functional standard. Additionally, any available design drawings or structural engineers

calculations should be obtained as this information may prove useful for future reference. Prior

to exchange of Contracts it is also essential to verify that the entire property can remain to be

fully insured for all risk at a normal premium.

Based on the style and building materials, the building is primarily formed with two distinct parts.

Most of the exterior around the corner elevations is either painted render of brick tile clad. Solid

brick wall structures form the four floor sector at 113a Pyle Street.

From the outset, it is relevant to state that Historic buildings (pre-1930) should not be compared

to a modern structure which would undoubtedly be subject to more stringent Building

Regulations, etc. Buildings of this age often have concealed defects which are usually tolerated

rather than carrying out sometimes unnecessary and expensive repairs. Similarly, the

specification of certain building materials would be less robust than modern equivalents. Of

course, the maintenance implications will be higher than a modern building but a prospective

Purchaser must, to a certain extent, be robust and pragmatic in the approach to owning such a

3property. Further advice and assistance for maintenance and renovation repair can be provided

by this Company, should you require.

This building will demand high maintenance care and attention to at least “hold the line”. Left

unattended, it is conjectured that the building would quickly fall into disrepair. Furthermore,

whilst this Report aims to provide detailed advice on those elements which can be seen, it is

possible (perhaps even likely) that concealed defects may exist which when exposed, will require

repair.

With effect from May 2004 there is a statutory requirement for those responsible for the

maintenance of commercial property and common parts of residential blocks to undertake

an ‘Asbestos Audit’ and keep a register of the locations at which materials containing asbestos

in any building are found. Accordingly, the following action is suggested which might perhaps

be taken on your behalf by your Conveyancing Lawyer:

ACTION: ascertain as to whether the Managing Agents or Management Company who are

responsible for the care and maintenance of the common parts at this property have complied

with the Statutory Requirements in this regard.

It is also essential to verify that this mixed use building has been appropriately assessed and

routinely inspected for Fire Safety purposes. Any previous recommendations must be

undertaken to ensure safety at this building.

To accompany this report and serve as a visual aid, we have appended various photographs and

drone images recorded during our inspections.

LOCATION

Located within the central region of the Isle of Wight, the property is situated at the corner

junctions between Pyle Street and St James Square, Newport. The elevation which faces Pyle

Street has a southerly orientation, approximately. For the purpose of this report, this will be

treated as the front elevation.

This location also forms part of Newport town centre Conservation Area.

The overall topography of this site is generally level. With reference to the British Geological

Survey Map for the Isle of Wight, ground conditions are labelled as variable deposits. In the

instance of this particular building, we saw no immediate sign of structural inadequacies which

would alert concern. In any event, you are strongly advised to verify that the building can be

insured for ‘All Risks’ at a normal premium but also to clarify whether previous structural repairs

have been completed with a certificate of structural adequacy.

CONSTRUCTION SUMMARY

The main walls comprise a variety of components from historic timber frame and solid brick

structures. Externally, there are a variety of claddings including painted render, brick tile, timber

and metal panelling. Pitched roof elevations have a natural slate covering and the large flat roof

4area is of mineral felt. Rainwater goods include a mix of metal and plastic components, partly

affixed to timber fascias. Windows are also a variety of sash and casements with timber single

glazed components and more modern uPVC frames double glazed installations. Floors at ground

level are both suspended timber and solid concrete, whilst upper floors are suspended timber.

Sanitary fittings and kitchen units are standard installations.

As is quite typical in buildings which have been adapted, particularly towards the latter part of

the 20th Century, it is possible that some of the materials may contain traces of asbestos fibres;

these are often found in soffit claddings, textured decorative coatings, water storage tanks,

amongst other materials. Whilst none were positively identified at the time of inspection, please

see more detailed remarks at Appendix I.

The detailed remarks in the following sections of this Report aim to give specific guidance upon

the structure and condition of the building, but by way of initial comment the routine

maintenance implications for the future care of the property will of course be quite demanding,

reflecting the age and context of the dwelling. The redress of exposure to the elements and the

usual maintenance of service installations, etc., will be the principal topics for routine attention.

ROOF COVERINGS

The roofs to the property incorporate various coverings, mainly comprising natural slate affixed

to the pitched roof elevations. There is also a mineral felt covered flat roof area incorporating a

glazed light panel and also access hatch. The flat roof covering is surrounded by a low level

parapet wall and incorporates two capped chimney stacks.

At the slate roof elevations, these appear to be in a generally tenable condition with no major

damage or distortions noted. The surface plane of the roof elevations are considered to be

reasonable for a building of this age and type. Accepting the odd slate or two, no significant

damage was noted. As part of your ongoing maintenance, it is recommended that replacement

of any damage or broken slates will be required, to ensure a fully weatherproof condition is

maintained. Looking at the various images using a drone camera, some of the slates are slightly

displaced but again not considered excessive. Normal maintenance repairs in this regard

therefore will be required.

The ridge and hip tiles also appear to be in a table condition, but on account of their age is

inevitable that minor degradation is present. It was not possible to confirm whether the mortar

securing the ridge and hip tiles is fully intact or robust, but at this stage, none appear to be

displaced. As part of ongoing maintenance attention, you should ensure that ridge tiles are

routinely observed to ensure that none become slipped or damaged/displaced. At an early

convenience, we would recommend that you make provision for a roofing Contractor to gain

close access to the slate roof coverings and ridge and hip tile to make any adjustments and

resecure the slipped slates and re-bed ridge and hip tiles as necessary.

At the northern side of the roof, adjoining the neighbouring red clay plain tile roof covering, it is

noted that in the lead valley some of the clay tiles have dropped into the valley. This is not ideal

5as such tiles can cause damage to the leadwork, cause blockage and allow water ingress to occur.

At the time of inspection, looking internally we could not see any signs of leakage and externally,

we could not see any obvious signs of damage. However, once your roofing Contractor is on site,

they should be requested to undertaken an inspection accordingly, to determine whether any

specific repairs are necessary at this time.

The lead flashings and soaker aprons at the wall and cladding junctions appear to be in tenable

condition. These flashings show signs of some general erosion and degradation, but remain

watertight at this time. Again, as part of long term maintenance it will be necessary to make

provision for replacement/renovation of these installations, to regain a fully weatherproof

condition. Already one patch repair has been undertaken towards the central length of the main

flashing detail to the brick wall abutment. This appears tenable at this time, from what can be

seen, within the limited confines of our inspection.

With regard to the mineral felt covered flat roof sector, clearly identified in the digital images,

this has been subject to many patch repairs. We are of the opinion that this covering is now

rapidly approaching the end of serviceable life and replacement will be required in the very near

future. This will require a very competent flat roofing Contractor to implement repairs

accordingly. In any event, you should obtain Contractors indicative costings at an early

convenience.

It is noted that the recessed drainage channels in the mineral felt covering discharges surface

water to the outlet to the rear. This passes through the parapet wall. Internally, water ingress

has occurred beneath. Evidence of degradation and damage could be seen at this junction. This

is allowing water to penetrate the wall and is likely to be a significant contributing factor to the

dampness at the rear of the building internally. Therefore, this must be considered as an urgent

action. You should arrange for a Contractor to gain close access to undertake further inspection

and investigation, so that repairs can be implemented as an urgent action. You will see this outlet

then joins a small section of guttering to the downpipe variously, where leakage is occurring.

The glass panel roof light is an older style basic installation, which again does show signs of some

degradation on account of its age. For the time being this appears tenable, but ongoing

maintenance will be required to maintain a fully weatherproof condition. This work should be

put in hand in conjunction with repairs to the flat roof covering.

The coping detail at the raised parapet wall around the flat roof covering is clearly very old, likely

to be perhaps over 100 years or more. Inevitably, some erosion and degradation can be seen.

During the flat roof upgrading works, repair and maintenance attention should also be

undertaken. These are clearly illustrated in the digital images attached to this report under the

drone inspection. As part of long term maintenance, you may need to consider implementing

repairs in this regard, to regain a fully robust condition.

At the eastern end wall, the neighbouring roof abuts the building of your proposed purchase. It

is understood that this roof covering is owned by Isle of Wight Youth Trust. Looking at the drone

6images, it is evident that part of the lead flashing to the rear corner of the building has become

displaced. It is also understood that repairs will be implemented by the neighbour although this

should be verified accordingly. You will appreciate that if the defect is not repaired, it could allow

water to penetrate your side of the building. No doubt you will consider this accordingly.

To the very rear of the site over the small courtyard area, there is a lower level flat roof covering

which is fouled by bird excrement. This is a very basic structure but appears functional at this

time. In the years ahead, replacement of this covering will be required, but this does not appear

to be an immediate objective. Additionally, above this flat roof covering, there is a timber

projection structure which has a slated pitched roof covering. Again, this appears to be in basic

functional condition with no major damage or obvious defects noted. Maintenance repairs will

be required from time to time.

ROOF VOID

Above Flat 2, is a roof void below the slate roof elevations. There are no internal access points

to inspect this roof void and no further comment can be provided. Using a thermal imaging

camera, there are indication that of high heat-loss to the ceilings. Therefore, you are

recommended to instal a suitable loft access to enhance insulation within this roof void. This will

also provide access to undertake the necessary inspection of the roof structure.

CHIMNEY STACKS

Two disused chimney stacks can be seen to the eastern end of the building. These are both

capped off and incorporate render cladding. No excessive degradation or wear and tear damage

could be seen in this regard. These are quite basic but appear to serve their intended function.

Normal maintenance attention will be required in the years ahead.

MAIN WALLS

The wall structures incorporate various installations including what appears to be solid

brickwork, mathematical tiles affixed to the historic timber frame; rendered clad panels, vertical

timber panelling, timber boarding, etc.

At the solid brick structures to the eastern end of the building, both front, side and rear, these

appear to be in tenable condition, albeit that some typical long standing minor erosion to the

pointing at mortar courses and also brickwork, can be seen. From time to time, repairs and

renovation will be required to enhance robustness and regain a fully satisfactory condition for

the long term. Once scaffolding has been erected, there will be a better opportunity to

implement repairs accordingly. However, it is conceded that to install scaffolding will be very

difficult as this will require access onto neighbouring roofs variously. In any event, to further

illustrate the condition of all the walls, we have attached various drone images to this report,

which show the general condition clearly.

At the rear north west elevation adjacent to the timber projecting structure, you can clearly see

where long established water leakage has occurred from the guttering and water outlet.

Unfortunately, this has tracked down the wall for many years and green algae is obvious.

7Additionally, this has caused rot and degradation to the window frames, timber joinery to the

projecting timber structure and also internally at the ceiling and walls, particularly in the ground

floor rooms.

As a result, the urgent action will be to ensure that guttering repairs are properly implemented

to regain a fully functional and satisfactory condition, to allow proper water discharge. This will

allow the walls and affected areas internally to naturally dry out.

The timber clad walls to the projecting timber structure at the northern side of the building is in

basic condition, but renovation repair will be required as rot and degradation could be seen in

various places. You will need to make provision for renovation repairs at an early convenience.

The metal clad walls on the rear northern side of the building are generally older installations,

but appear relatively functional. Accepting some typical minor degradation and areas of

vegetation growth, algae, bird droppings, etc., this appears to be in tenable condition. Normal

maintenance will be required.

At the western end of the building, that which faces St James Square, the wall structures appear

to incorporate the historic timber frame clad externally, at least in part, with mathematical brick

tiles. These are in relatively tenable condition, accepting their age and type. Between the bay

window and upper window, it is evident that parts of the mathematical tiles are distorted and

partly damaged. As a result, renovation repairs are considered necessary as part of ongoing

maintenance attention. You will see also at the southern side of the building down Pyle Street,

these mathematical tiles have been painted many times over the years and decades, along with

patch repairs. As part of your short to medium-term maintenance, we would recommend that

you engage a competent Contractor to implement investigative works around the slightly

displaced mathematical tiles above the west bay window to ensure that no leakage or significant

issues are present which would require repair. Routine decoration will also be required in the

short term ahead, to enhance appearance and prevent any water ingress.

At the small bay roof covering overlooking St James Square, the covering appears to be an older

installation, perhaps well in excess of 70 years old, or so. Some typical degradation can be seen

but again, this appears reasonable at this time. A time can be foreseen in the near future which

replacement is likely but this is not an immediate objective. This should be routinely observed

so that replacement can be undertaken in due course.

Along the front of the building, that elevation which faces Pyle Street, there are also various

render panel sections, some of which have been the focus of recent works, following an

insurance claim. It is understood that you have already spoken with the Contractor, Messrs

Roberts & Redhead, who undertook the repairs on behalf of the vendor. The full scope of works

at this stage is not yet known, although we are told that the entire panelling externally was

removed at the relevant sections and the underlying timbers exposed and considered for

condition. Any relevant repairs were reputedly undertaken and we believe insulation materials

were installed to enhance thermal efficiency. Again, the full scope of works must be discussed

as part of your own enquiries before Contract, to ensure that you are in a fully informed position

8to proceed. Ideally, you should also obtain any photographs which may be available once the

building was exposed.

GUTTERING

The gutter channels incorporate a mix of plastic and metal installations. All show signs of some

typical corrosion, general degradation and repair maintenance attention will be required at an

early convenience. Of particular note is the fact that at the northern side of the building, part of

the guttering has already become displaced on account of significant vegetation build-up and

broken brackets. As a result, at an early convenience, you are strongly recommended to arrange

for a Contractor to realign, reseal, clean and adjust all gutter channels to ensure proper water

discharge is present. Again, the digital images attached to this report clearly illustrate the current

condition.

JOINERY

The external joinery incorporates older components, but these have been subject to

redecoration over the years. Of course, at the northern side of the building where access is

significantly restricted, no specific maintenance works appear to have been carried out recently.

As a result, the timber installations are showing signs of age related damage and wear and tear.

It will therefore be necessary to arrange for a Contractor to implement repairs at an early

convenience, to prevent any further degradation occurring and also to enhance appearance and

longevity.

WINDOWS

A variety of window and door styles are present across the elevations of the building. Following

recent insurance relating repairs to the south elevation, two modern uPVC double glazed sash

windows have been installed. Whilst we are told that this sector of the building does not form

part of a Grade II Listed Structure, it is essential to verify that replacement windows have been

installed within the necessary Statutory Consent. Windows serving the top flat (Flat 3) are also

uPVC double glazed installations. Any existing Warranty relating to replacement windows should

be obtained for verification.

Above 113a Pyle Street, 6 historic single glazed timber frame sashes remain. In several locations

evidence of distortion and wet rot degradation can be seen. Temporary repairs have been

undertaken. Where opened, some of these sashes are significantly stiff to operate. Additionally,

the external painted finish has rapidly degraded, which will accelerate timber degradation.

Therefore, the necessary repair, comprehensive preparation and redecoration of these sash

timber frame windows is recommended. Of course, all relevant works must be undertaken in an

appropriate manner for this Grade II Listed sector of the building.

The west facing second floor sitting room window is a relatively modern single glazed timber

frame sash component. This was found to be in a functional condition with no obvious damage

or defects noted

9Most of the windows at the rear elevations of the building are basic single glazed casements.

Some of these installations could not be opened and localised areas of timber related

degradation can be seen.

Overall, the various timber frame windows at the property will require a significant level of initial

required repair, along with comprehensive redecoration. In order to budget for these works,

Contactors indicative costings should be obtained. Therefore, you are recommended to engage

a competent contractor to inspect all windows at the property to provide a formal quotation for

the necessary repairs and maintenance. It is also likely that scaffolding access will be required,

in order to implement this initial maintenance.

The ground floor remote entry intercom at the shared flat entrance does not appear to be

functional. This should be repaired or replaced to improve function and security at the property.

Around the ground floor commercial sectors of the building, large single glazed timber frame

windows and doors are present. In several locations, further similar areas of minor degradation

could be seen and the necessary maintenance attention should also be planned for. This will

likely include areas of localised repair along with comprehensive preparation and redecoration.

It is important to establish the specific maintenance responsibility of these commercial windows

and doors at the property.

INTERIOR

FLAT 1

The interior of this flat is found to remain in a reasonable condition, although upgrading works

of both the fitted kitchen and sanitary fittings should be planned for. Areas of wear and tear

damage were noted to the kitchen and overall, this is considered to be a dated installation.

The sanitary fittings within the bathroom are also generally dated and appear to have been the

subject of various basic repairs over time. There are several soft areas of flooring within this

bathroom indicating that past leakage has occurred, resulting in damage to the chipboard

flooring beneath. Once all sanitary fittings have been removed, the full extent of flooring repairs

can be revealed.

Due to the positioning of the window frame within this bathroom, an alternative arrangement

should be considered, for a practical shower to be used without causing damage to the timber

frame window. Additional, mechanical extractor fans within the both the kitchen and bathroom

should also be upgraded to more powerful installations in order to prevent condensation related

dampness occurring at the property.

There is a second WC off the inner hallway. This does not appear to be regularly used and the

flush handle is damaged. Additionally, several areas of condensation related staining and

internal damage to the plaster finish were noted. This sector of the building appears to be single

10skin and possibly timber frame. As a result, the effects of condensation and high moisture will

be more prevalent and should be managed accordingly.

The majority of the single glazed timber frame sash windows also exhibit signs of general wear

and tear damage, which will require repair. In conjunction with these works, comprehensive

preparation and redecoration of the frames will be necessary to prevent further defects

occurring.

The west facing living room bay window appears to be in a generally satisfactory and functional

condition.

Within the flat, there are several areas of damaged internal plaster. During the next redecoration

of this flat, areas of replastering repairs should be planned for.

A relatively modern electrical distribution board is present within the kitchen area. This

appliance incorporates RCBO switches and appears to have been last inspected in November

2025.

A mains gas supply serves the central heating boiler. This appliance is a non-condensing

combination boiler, located within the bathroom. Based on the apparent age, it is likely that

replacement of this boiler will be required in the short term ahead. Surface mounted pipework

within the entrance hall area close to the south facing window should also be appropriately

refixed as this is no longer fully attached to the wall. Pipework now rests on the carpet and will

be prone to damage/leakage.

This appears to be the only gas appliance within the building. The gas meter is located at the

communal entrance. It is therefore essential to obtain the service history records of this central

heating boiler. If no available documentation is provided, you must engage your own Gas Safe

Registered Contactor to undertake an inspection, safety testing of servicing of the gas

installations serving Flat 1.

FLAT 2

Forming the second floor accommodation, Flat 2 is found to be in a generally satisfactory

condition, although some areas of wear and tear were noted. As mentioned previously, the pair

of historic timber frame sash windows towards the south east of the front elevation will require

significant repair or even replacement.

Most of the internal walls and ceilings are internally lined with plasterboard sheeting material.

Some areas of cosmetic imperfections were noted, particularly at the west elevation within the

main living room. Therefore, future plastering repairs and redecoration should be planned for.

There are several areas where creaking floorboards were noted. Additional fixings should

therefore be added to reduce any potential disturbance. Once existing floor coverings and

furniture have been removed, the full extent of these works can be revealed.

11There are several areas of historic distortions noted with the suspended timber floor structures.

These appear to have developed over a long period of time and are commensurate for a building

of this age and tyle.

The self-closing mechanism at the main entrance door from the communal stairwell has been

disconnected. To enhance Fire Safety, all disconnected self-closing mechanisms within the

building must be reconnected as necessary.

All other areas of the internal joinery within this flat would benefit from the necessary

preparation and redecoration, which should be planned of within the next 18 months,

approximately.

The sanitary fittings are in a functional condition, although general wear and tear damage could

be seen, particularly at the bath panel.

Further areas of wear and tear damage were noted around the fitted kitchen and initial require

repairs should be anticipated.

Around the mechanical extractor fan within this kitchen, evidence of water ingress staining was

seen. This ingress has also affected areas beneath, as seen within the Bookshop at 113a Pyle

Street. Therefore, further investigation is recommended to this sector of the building to

undertake the necessary repair work and prevent further water ingress from affecting other

internal parts of the property.

The heating system within this flat is via a series of electric panel heaters. Hot water is provided

by a pressurised storage vessel, found to be operational during our inspection.

Mechanical ventilation, particularly within the bathroom, must also be appropriately

maintained. This will prevent potential condensation related dampness occurring at the

property.

There are two electrical distribution boards of varying styles. One of the components is a modern

installation and appears to have been last inspected in 2025. The second distribution board is

slightly dated and incorporates Micro Circuit Breakers with Residual Current Device protection.

FLAT 3

Located at the top floor of the building, this is a small bedsit. The cupboard accessed from the

bedroom area does not lead to any access panel to inspect the roof void above Flat 2. Our

inspection of this cupboard was significantly limited by the quantity of stored items present.

Windows serving this flat are standard uPVC double glazed installations. Whilst these appear to

remain in a generally functional condition, misting was seen within the double glazed units

serving the bedroom area. Therefore, this double glazed units should be replaced.

12Whilst the sanitary fittings are found to be in a basic functional condition, the effects of

significant surface related condensation is present around the shower room ceiling. As there is

unlikely to be any specific installation material above this flat roof sector of the building, future

improvements should also be considered. Additionally, an appropriate and powerful extractor

fan should also be installed above or around the shower cubicle, to reduce moisture levels and

prevent condensation occurring.

The kitchen is found to be in a generally basic but functional condition. Areas of general wear

and tear were observed and some general maintenance should be undertaken upon your initial

owners of the property.

The kitchen laminate floor covering was damaged and will require repair/replacement.

Additionally, the flat entrance door lock has been damaged and repaired to a very basic standard.

There are two slightly dated electrical distribution boards. Only Micro Circuit Breakers were seen

at these distribution boards and no obvious Residual Current Device was observed. It is

important to verify whether the electrical installations at this flat have been recently inspected.

Hot water is via a pressurised storage vessel. Some corrosion was seen at one of the connecting

pipe components. Whilst no leakage was seen, this junction should be checked by your

contractor.

At the inner hallway close to the entrance serving this flat, evidence of water ingress is present.

This has resulted in significant staining to parts of the walls and ceiling. There is a basic rainwater

channel and junction located above this area of the property. Therefore, the necessary repair to

improve this junction should be undertaken to prevent water ingress occurring. Once the

necessary external works have been undertaken, replacement of the damaged plaster internally

will be required.

There is an internal access point to reach the flat roof area above this sector of the building. This

access should be locked to prevent any tenants form gaining access to the flat roof above.

24A ST JAMES SQUARE

This small commercial property provides consumable products, mostly of a fast food style

standard. As no doubt you are aware, this is a very small retail unit with basic fittings.

The internal walls are lined for sanitation. Overall, no significant damage or defects were

observed.

This small retail unit includes an independent electricity meter supply with distribution board.

This appliance incorporates Micro Circuit Breakers with dual Residual Current Device protection.

It is not known when this was last safety tested.

13Whilst there appears to be a mains water supply, there is no waste water connection. As a result,

waste water produced from cleaning has to be transported away from the building. This will also

increase vendors using highway drainage gullies, although this was not confirmed.

24 ST JAMES SQUARE (JEWELLERS)

Forming the corner property between St James Square and Pyle Street, this retail unit has

operated as a Jewellers for many years. Internally, the retail areas is fitted with various cabinets,

storage compartments and worktops. To the rear, there is a basic WC.

Following discussion with the Tenant, we understand that occasional water ingress occurs below

the external pediment around the shop signage. Externally, this includes a basic plastic capping

board which does not appear to be robust. Therefore, future repair should be planned for in

order to prevent water ingress occurring, causing damage to the internal fabric.

The WC and wash hand basin appears to have a suitable waste connection. Hot water is via an

instantaneous hot water heater. A separate water meter is situated above the WC.

The former rear window has now been boarded over which has been adapted with a mechanical

extractor fan.

There is a separate electricity meter and relatively modern electrical distribution board. This

appliance incorporates RCBO switches and appears to have been last tested in October 2025.

Overall, based on our limited inspection, no further cause for concern or obvious defects have

been identified.

113 PYLE STREET (BARBERS)

The majority of the retail area is also lined internally with various storage units, plasterboard

sheeting and other equipment. Overall, the condition appears to be generally satisfactory with

no significant cause for concern noted.

A separate water meter is located adjacent to the WC and instant electric water heater for hot

water.

Within the kitchen area, waste services have been installed through a former rear door. As a

result, this rear door leading to the small rear courtyard area is no longer in use.

A separate electricity meter and distribution board with Micro Circuit Breakers and Residual

Current Device for protection was seen. This also appears to have been last inspected in March

2025.

Mounted at ceiling level, there is an air-conditioning unit. We are unable to confirm whether this

connects with any external fan unit.

14113A PYLE STREET (BOOK SHOP)

Internally, there are several supporting metal poles which are assumed to form structural

components within the building.

The standard of finish to internal lining materials such as the plasterboard ceilings and wall

linings appears basic but functional.

Around the rear WC, evidence of significant water ingress staining was seen. This appears to

relate to penetrating dampness from an area of the property above and therefore, further

investigation/repair should be undertaken (see previous remarks).

This commercial property includes a separate electricity meter. A modern electrical distribution

board is present which appears to incorporate RCBO switches, last tested in March 2025.

At the rear of the property, there is a basic timber access door leading to the small rear courtyard

area. Netting installed as a deterrent for nesting birds is damaged and various pigeons have

entered. It is therefore essential that this netting is appropriately repaired and maintained to

reduce potential risk to animals.

There is a single surface water drainage gulley at this small rear courtyard. It is essential for this

drainage gulley to also be routinely checked and kept clear of any obstructions. This will prevent

surface water ponding occurring which may lead to internal dampness at the building.

A single drainage inspection cover was lifted at this rear courtyard. Where seen, a generally

adequate flow of water was observed. No obvious evidence once blockage or damage has been

identified.

Also within this rear courtyard area, there are various waste water drainage pipes mounted to

the exterior of the building. Any disused components should be appropriately capped and

removed. Due to the area of water ingress noted affecting the ground floor WC within this

Bookshop, all waste water connections above should also be closely inspected in order to

address any existing defects.

COMMUNAL

The communal entrance hall leading to the Upper Flats is accessed form Pyle Street. Self-

evidently, the inner stairwell is an historic structures, presumably late Georgian. As a result, the

staircase is generally steep, although functional.

At the time of inspection, stored items including a bicycle were noted at the top floor landing.

Tenants must be reminded that any stored items within circulation areas pose a potential risk

for means of escape.

Rear facing windows from this communal area are in a basic condition and require initial

repair/maintenance to regain functionality.

15Within the communal entrance, there is a communal fire alarm system. This appears to connect

with various detectors/sounders within separate parts of this building. Based on the visual

appearance alone, no significant defect were seen. However, it is essential to obtain all relevant

documentation to very that Fire Safety equipment at the property is in a compliant condition.

The question of sound transfer between separate levels of the building is also an important topic

for further consideration. Your pre-Contract enquiries should reveal whether any sound proofing

measures have been installed to reduce disturbance between individual floors at the property.

There are some areas of surface related damage noted to the internal plaster finish. This was

seen within a small number of locations and can be addressed when the property is next

redecorated.

At the top floor landing, there is a fixed skylight window. The internal glazing panel is cracked

and will require replacement.

SERVICES

At the communal ground floor entrance, there is a single mains gas supply and single meter. This

supply serves Flat 1.

Also within the communal entrance hall area, there is a mains electricity gable which appears to

split and serve the various domestic parts of this building. Earth bonding was seen at this supply.

This also appears to include a separate Landlords supply that presumably feeds the communal

lighting and fire alarm system.

Within this ground floor entrance, there are three separate water stopcocks present. We have

assumed these isolate the supply to individual flats, although this was not confirmed. Separate

water meters are possibly located within a subterranean compartment at the Pyle Street

pavement. However, this was not confirmed.

SUMMARY

Overall, the building is found to remain in a reasonably robust condition, although there are

areas of initial maintenance required, particularly relating to the fenestration, flat roof covering,

rainwater goods and external painted masonry.

It is important to understand that this Report is not a full forensic analysis of the building in

respect to defects. There are various obvious areas of damage and defects which will require

repair. Additionally, there will inevitably be areas where concealed damage is present which,

when exposed would/may require repair. With the fact that we have not exposed the building

or undertaken a destructive investigation and also that various stored items and furniture are

present throughout, it is inevitable that there will be the presence of some issues and defects

which we cannot see or advise you upon. Our report therefore provides you with a good

overview of the condition and also advises of areas where known further investigation will be

required

16In your interpretation of the remarks in this Report, please bear in mind that this property is like

most old buildings which have been altered and adapted over the course of their history: there

is a complexity of construction types and the changes which have been made have involved

compromises. The implications for the future repair and maintenance of the property should not

be unduly onerous, but it will be realistic to anticipate that a reasonably diligent standard of